Skip to the main content

#NEWS · Live feed · Nord

The submarine cable project in Haiti: promises and realities

0

By Desir Dorcely

1 min read

The Ministry of Public Works, Transport and Communications (MTPTC) has announced a significant milestone in the preparation of the HA-J0017 project in Washington. The estimated amount is 200 million dollars over six years to strengthen Haiti's international connectivity and modernize digital infrastructure.

Stated Objectives

The MTPTC is aiming for better connectivity, digital identity, electronic signatures, and cybersecurity. The project notably includes the acquisition of the TAM-1 unit for a landing in Cap-Haïtien with an initial capacity of 400 Gbps.

Critical Context

Although the project is appealing, a critical reading is necessary. The MTPTC press release uses vague and solemn phrasing without detailing mechanisms for transparency or public auditing. Furthermore, Haiti has already seen several promising projects fail due to chronic insecurity, institutional weakness, and corruption.

Geopolitical Risks

The TAM-1 cable is a submarine system developed by Trans Americas Fiber System (TAFS), with AT&T as the anchor tenant in the United States. The Haitian HA-J0017 project aims to connect to this network, but Haiti is not initially planned as a primary landing point.

Challenges and Questions

The MTPTC still needs to detail implementation timelines and transparency mechanisms. The risks related to ownership, control, and geopolitical alignments must be clearly assessed. The HA-J0017 project could be a real opportunity if conducted with rigor, but as it stands, it looks more like a political communication exercise.

More on this story

← Back to the live feed

Comments 0

An editor reads every comment before it appears. NAGO does not publish a comment it has not read.

  • Loading comments…